Skip to content

Case Studies

Lower pavement life cycle cost – smoother, safer and quieter roads – improved rutting and cracking resistance. Lower binder viscosity No special binder tank No risk of rubber separation

By Asphalt Plus
Used on All Road Types
Dry Process Simplicity

Rubberized Asphalt Odessa Texas Case Study

◎ Project Overview A local contractor in West Texas and TX DOT laid a SMAR-F asphalt mix that was modified with ECR in late 2021. 📍 Project Location Texas Route 385-Odessa District, McCamey, TX. Summary of Dry Process Engineered Crumb Rubber (ECR) Texas Route...

read more

Michigan Dry Process Rubber Asphalt Project

Michigan Rubber Asphalt Project Asphalt Plus, LLC conducted a trial rubber asphalt project in Michigan using the Dry Process with Elastiko Engineered Rubber Asphalt. Same as the other successful projects, we recorded the process to show just how the Dry Process of...

read more

Dry Process Rubber Asphalt Project

I-39 in Beloit, WI Dry Process Rubber Asphalt In late 2017, WIDOT approved the use of a WIDOT WI-12.5 N75 SMA mix modified with ElastikoTM ECR as an alternative for a polymer modified mix.  The project provided the opportunity for WIDOT and the contractor to...

read more